Salou.com
Leisure, tourism and weekend
Arrival & transport Arrival & transport
Hotels and Aparthotels Hotels and Aparthotels
Apartments to rent Apartments to rent
Camping Camping
Beaches and nudist beaches Beaches and nudist beaches
Food and Drink Food and Drink
Discover Salou Discover Salou
PortAventura and more PortAventura and more
Shopping and Services Shopping and Services
The Night The Night
Tours and excursions Tours and excursions

Salou / News / Guide

Awarded the final phase of improvement works of the old town of Vila-seca

Awarded the final phase of improvement works of the old town of Vila-seca



Vila-seca. Costa Dorada. The Local Government Board has awarded the contract for the last phase of the renovation and improvement of streets in the Old Town of Vila-seca. These works refer to the last phase of the C sector that includes the streets of San Jose, Tarragona (between Plaza Estudi  and Las Ramblas), St. Peter (upper section between the square and the required street Blacksmiths), the Virgin of La Pineda (upper section between the space required and the Ferrers Street), San Antonio (section between the street from the Mill and the Ferrers Street), Santa Barbara, and the Ferrers Square studio. The general idea in all the streets, is to pave the sidewalk using flamed granite pieces the same width of 15 cm and of different lengths and colors, using the same shape as the section renovated in Sector B. The works of this phase will entail the complete renovation and improvement of all public services of roads (sewer, storm, water, extension of gas networks and telephone lines underground and overhead electricity and telephone) and renewal of street furniture and the installation of two sets of underground waste containers. These works have been awarded for 1, 71 million euros to be paid in full at no cost to residents and merchants of the streets affected. The comprehensive renovation program from the streets of the old town, begun in 2005, completed this year and will mean the renewal of a dozen streets in the historic town of Vila-Seca, with an area of ​​25,000 m2, a length of 3, 5 kilometers of streets and a total budget exceeding 11 million Euros.  



Tags: costa dorada, tarragona, practical guide, useful guide, program events, tours
REQUEST MORE INFORMATION BY EMAIL
* Name and Surname * Question
Telephone
* Email
*I accept the Conditions of Use
*
Return
Booking hotels
+ Salou.com