Salou.com
Leisure, tourism and weekend
Arrival & transport Arrival & transport
Hotels and Aparthotels Hotels and Aparthotels
Apartments to rent Apartments to rent
Camping Camping
Beaches and nudist beaches Beaches and nudist beaches
Food and Drink Food and Drink
Discover Salou Discover Salou
PortAventura and more PortAventura and more
Shopping and Services Shopping and Services
The Night The Night
Tours and excursions Tours and excursions

Salou / News / Art

Enter a service of the new four-lane section of the Raval Mar, Vila-seca

Enter a service of the new four-lane section of the Raval Mar, Vila-seca



Vila-seca. Costa Dorada. To facilitate mobility throughout the summer 2011, the Department of Planning and Sustainability has been put into service as a section with four lanes of Mar del Raval (Vilaseca), in particular, between the C-31B and the roundabout with the TV-3146. With the same objective, during the summer do not work in the area closest to Pineda. The Department of Planning and Sustainability has run since the summer of 2010, construction of Mar del Raval, in Vila-seca. This action corresponds to the preparation of TV-3148 and involves the formation of two roads: one main and four lanes with urban characteristics, 3.3 kilometers from the A-7 motorway in La Pineda (square the European Union) and a second of 2.1 kilometers and two lanes for the traffic of heavy vehicles from the A-7 to C-31B. Moreover, the work also includes the formation of a green area of ​​separation between the two roads and a specific lane for cyclists, as well as an area for walking and relaxation. As individual elements, it should be emphasized a catwalk 363 feet long on the A-7 for pedestrians and bicycles and two structures under the railroad. The works include an investment of 23.7 million euros. Traffic during the summer To facilitate mobility in the area during the summer, the Department of Planning and Sustainability has established the following measures: Commissioning of a stretch of road with four lanes, two in each direction, in particular, between the roundabouts of the C-31B (round the roller) and the TV-3146. This section has a length of 750 meters. The traffic lanes have a width of 3.25 meters wide each and both directions of traffic are separated by an average of 1 meter. Commissioning, for next Thursday, June 23, the bicycle lane and sidewalks on the stretch between the roundabout and the end of the steamroller of the action, the confluence with the square of the European Union. Stop the activity to fall on the stretch from the roundabout on the C-31B to the end of the work. Thus, the work will concentrate on the section between the A-7 and C-31B, with the completion of tasks such as earthmoving, running under the railway structure of urban road, the firm the heavy road and foundation of the walkway for pedestrians and cyclists. El Raval de la Mar The future of the Sea Raval improve communications between the town of La Pineda Vila-Seca and at the same time to facilitate the connection of Vila-seca Tarragona port through the C-31B. In addition to connecting with the A-7 and C-31B, this road will provide access to the service area of ​​Port Aventura, the sports and leisure residential complex, the shrine of Our Lady La Pineda and urban park in the Tower of Sweet, among others. Also, segregated by road will facilitate the mobility of trucks, often heavy and goods classified by origin or destination of the industrial area. At the same time, prevent the passage via desdoblada main work will promote the safety and fluidity of movement. The works are part of an agreement of collaboration between the Government, the Provincial Council of Tarragona, the city of Vila-seca, Tarragona Chemical Business Association and Ercros industrial companies, Bayer and Clariant Iberica polymer.  



Tags: costa dorada, la pineda, painting, sculpture, exhibitions, museums
REQUEST MORE INFORMATION BY EMAIL
* Name and Surname * Question
Telephone
* Email
*I accept the Conditions of Use
*
Return
Booking hotels
+ Salou.com