Salou.com
Leisure, tourism and weekend
Arrival & transport Arrival & transport
Hotels and Aparthotels Hotels and Aparthotels
Apartments to rent Apartments to rent
Camping Camping
Beaches and nudist beaches Beaches and nudist beaches
Food and Drink Food and Drink
Discover Salou Discover Salou
PortAventura and more PortAventura and more
Shopping and Services Shopping and Services
The Night The Night
Tours and excursions Tours and excursions

Salou / News / Art

The beaches of Cambrils are brought on line for the 2010 season

The beaches of Cambrils are brought on line for the 2010 season



Cambrils. Costa Dorada. The beaches of Cambrils are already preparing for the 2010 season. The City Council has begun the work of arrangement, which began on February 22 and end on March 27. These, provide leveling of sand, stone removal, cleaning and garbage collection, among other things. They will go through this conditioning Regueral beaches, La Riera, Horta de Santa Maria, La Llosa, El Dorado, the Cavet, l'Esquirol, Vilafortuny, Ardíaca and Cap de Sant Pere. Beach by beach Playa Regueral: you need to be in very good condition, as in summer. • Leveling the ground with the input of sands in the deep areas where the water puddle. • Leveling the frontal dune to the water. • Survey and discovery of pasarelade concrete. Where is deteriorated parts will be loaded into the warehouse. • Settlement of the entire side of the steps, boot and remove the herbs. • Opening and drainage ravine Regueral. • water the ramp is the end of the beach in order to travel with the equipment. • cleaned with leveling and sifting. • During the week we will see is the compaction of the sand and if necessary, we will wrought. Playa de la Riera: fix correctly this time. • Removal of stones • Leveling the sand • Clean with cleanser. • Opening of the channel end of the Riera de Alforja Playa de l’Hora de Sta. Maria: is done correctly this time. • Leveling the frontal dune to the water. • Removal of stones from the middle to the jetty. • Opening and drainage ravine Virgen del Camino • Leveling the dune area golf water front St.. Jordi. • Providing sand in the inner zone where the channel is formed out of the ravine with subsequent leveling. Playa La Llosa: fix the area of the Hotel School. • Leveling the frontal dune to the water. • Leveling interior area where SOS booth Playa El Dorado: It will be like in summer. • Removal of stones from the cliff side of Gene. • opening of the herbs that occupy part of the beach. • Leveling the frontal dune to the water. • Leveling the entire inside of the beach. Playa del Cavet: It will remain as is, will only be cleaned manually. • Level the area of access where there is a bottom front of the stall. Playa de l'Esquirol: is done correctly this time. • fix the dune in front of the sailing school by creating a single profile to be able to clean up the area with sieve. Vilafortuny Playa: is done correctly this time. • The unmount all protective sand piles with the laying of the sand where needed to fill. • Leveling the frontal dune to water in areas outside hotels. • Leveling and alignment of all areas of the hotel and Apartments Els Pins. • The remaining area will be passed to refining. • retro mini will be cleaned with all the low wall side of the ride. • Adequacy of stormwater outlets to the water forward. Cap de Sant Pere Playa: Can not mechanically fix for lack of sand. • There will be spent with a refiner. • gorge opens term with back end cleaned and conditioning. Playa de l'Ardiaca: Given that you can not do a complete fitting, which will be held around the month of May, run the refinery on points that allow manual collection and everywhere In all the beaches there will be a collection of existing waste so mechanically and then will manually refiner.



Tags: costa dorada, alforja, painting, sculpture, exhibitions, museums
REQUEST MORE INFORMATION BY EMAIL
* Name and Surname * Question
Telephone
* Email
*I accept the Conditions of Use
*
Return
Booking hotels
+ Salou.com